
One of the largest metal roofs in the world
More than 231,000 m² of metal, over 900 tonnes in weight and more than 100,000 litres of paint. The roof covers 210,000 m², with a further 21,000 m² of façade cladding. A roll-forming line was built on site for the 24,600-odd metal profiles, some of them 96 metres long. A crew of 28 needed almost ten months to produce some 600 kilometres of profile, at heights of up to fifty metres. The extreme outdoor temperatures placed particular demands on both the material and the coating.







